FM 460 - Notice Affording an Opportunity for a Public Hearing

To view the June 2025 virtual public meeting information please click HERE

FM 460 - Notice Affording an Opportunity for a Public Hearing

FM 460 from US 80 to FM 740 and FM 740 from Ranch Road to north of Maverick Drive
CSJs: 2249-01-009 and 1091-01-023
Kaufman County, Texas

Purpose

The purpose of this notice is to afford an opportunity for a public hearing regarding proposed improvements to Farm-to-Market Road (FM) 460 from FM 740 to US 80, and FM 740 from Ranch Road to north of Maverick Drive in Kaufman County, Texas. All hearing requests and comments must be received on or before May 15, 2026.

Description

The proposed project would reconstruct and widen FM 460 between US 80 and FM 740, and FM 740 between Ranch Road and Maverick Drive in the city of Forney, Kaufman County from a two-lane roadway to a four-lane (ultimate six-lane) divided roadway. A continuous 6-foot-wide sidewalk would be built on one side of the roadway and a continuous 10-foot-wide shared-use path on the other side. The existing FM 460 and FM 740 right-of-way (ROW) width is approximately 90 feet wide throughout the length of the project. The proposed ROW width is 120 to 215 feet wide. The overall project length would be approximately 5 miles.

The proposed project would, subject to final design considerations, require additional right of way and potentially displace one residence and one non-residential structure. Relocation assistance is available for displaced persons and businesses. Information about the TxDOT Relocation Assistance Program and services and benefits for those displaced and other affected property owners, as well as information about the tentative schedule for right-of-way acquisition and construction, can be obtained from the TxDOT Dallas District office by calling 214-320-6675.

The proposed project would involve construction in wetlands.

The proposed project would involve an action in a floodplain.

Any environmental documentation or studies, maps and drawings showing the project location and design, tentative construction schedules, and other information regarding the proposed project are on file and available for inspection Monday through Friday between the hours of 8 a.m. and 5 p.m. at TxDOT Dallas District office c/o Liang Ding, P.E., 4777 E. Hwy. 80, Mesquite, TX 75150-6643, 214-320-6625. 

Memorandum of Understanding

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 17, 2025, and executed by FHWA and TxDOT.

Downloads 

Notice Affording the Opportunity for Public Hearing (English)
Notice Affording the Opportunity for Public Hearing (Spanish)
Project Location Exhibit Board
Project Schedule Exhibit Board
Project Typical Section Exhibit Board
Schematic

Contact

TxDOT Project Manager Liang Ding, P.E. Liang.Ding@txdot.gov