The virtual hearing begins on Thursday, May 21, 2026, at 5:00 p.m. and will remain available online through the comment period deadline of Friday, June 5, 2026. During this time, please view the project materials and other information provided on this site to learn about the project and provide your comments.
PROJECT DESCRIPTION
The proposed project would reconstruct and widen FM 543 in stages based on traffic volumes and available funding. Initial construction would consist of four travel lanes (two in each direction) with a grass median and would be widened to the inside once warranted by traffic. The project would ultimately consist of six 12-foot-wide travel lanes (three in each direction) with a raised median ranging from four to 24 feet wide. The proposed project would also realign FM 543 between CR 201 and CR 168 to enhance safety along FM 543. Eight to 10-foot-wide shared use paths would be constructed along both sides of the proposed FM 543 roadway. The proposed right of way (ROW) width would vary between approximately 118 to 293 feet.
PRESENTATION
TxDOT EXHIBITS
You may click on any of the project exhibits below to view them at full size
SCHEMATIC
RIGHT OF WAY (ROW) INFORMATION
The proposed project would, subject to final design considerations, require additional right of way and potentially displace one residence.
Information about the process for state purchase of ROW and relocation assistance may be found in the following pamphlets:
Relocation Assistance: English
Relocation Assistance: Spanish
State Purchase of ROW: English
State Purchase of ROW: Spanish
Landowner’s Bill of Rights: English
Landowner’s Bill of Rights: Spanish
HOW TO PROVIDE COMMENTS
The deadline for providing comments is Friday, June 5, 2026.
QUESTIONS?
Contact the TxDOT Project Manager Liang Ding, P.E. to ask questions about the project at Liang.Ding@txdot.gov.