US 75
US 75 From I-635 to SH 121
Dallas and Collin Counties
CSJ: 0047-06-145 , 0047-07-219
Project Weblink : http://www.us75mobility.com/
US75 From President George Bush Turnpike (PGBT) to Park Blvd
Design Schematic (PRELIMINARY SUBJECT TO CHANGE WITHOUT NOTICE)
CSJ: 0047-06-133
- Design Schematic - Roll 1 of 7
- Design Schematic - Roll 2 of 7
- Design Schematic - Roll 3 of 7
- Design Schematic - Roll 4 of 7
- Design Schematic - Roll 5 of 7
- Design Schematic - Roll 6 of 7
- Design Schematic - Roll 7 of 7
US 75 From SH 121 to Telephone Road (CR 275)
Design Schematic (PRELIMINARY SUBJECT TO CHANGE WITHOUT NOTICE)
CSJ : 0047-06-108
CSJ: 0047-14-046
US 75 From Telephone Road (County Road 275) to County Line Road (County Road 375)
Design Schematic (PRELIMINARY SUBJECT TO CHANGE WITHOUT NOTICE)
CSJ: 0047-14-053
The major changes to the design schematics are:
- The SH 121 westbound to US 75 northbound frontage road was changed from a T-intersection to a ramp-like configuration.
- The US 75 northbound frontage road was changed to a 2-lane continuous section from SH 121 to Davis Road.
- The US 75 northbound frontage road to SH 121 eastbound was changed from a stopping condition tie-in to a ramp-like configuration.
- A right turn lane has been added at the US 75 northbound frontage road to Davis Road intersection.
- CR 276 and CR 277 previously tied into the US 75 southbound frontage road just north of Telephone Road have been combined into a single entry to the southbound frontage road.