SH 114 at FM 156 - Public Meeting

Thursday, December 12, 2013

CSJ: 0353-02-063

The Texas Department of Transportation (TxDOT) will conduct a Public Meeting for the proposed improvements to the SH 114/FM 156 Interchange in Denton County, Texas. The Public Meeting will be held in the Pike Middle School cafeteria, 2200 Texan Drive, Justin, Texas 76247 on Thursday, December 12, 2013 from 6:00 pm to 8:00 pm.

The purpose of the Public Meeting is to present the proposed project to the public and receive comments. It will be conducted in an informal open house format with no formal presentation. Representatives from TxDOT and project consultants will be available to answer questions.

The proposed project would reconstruct and improve the SH 114/FM 156 Interchange. The initial project was approved in 2008 as a jug handle type intersection but was redesigned as a full diamond interchange to improve operational efficiency and safety during final design. The interchange design is fully compatible with ongoing reconstruction of SH 114. Additional right-of-way (ROW) is anticipated to be required throughout the interchange. The potential acquisition of 27.7 acres of ROW and 9.1 acres for drainage easements would impact undeveloped, residential, commercial, or industrial properties. The acquisition of ROW and easements would result in the displacement of the gas station and convenience store in the northwest quadrant of the interchange and a commercial billboard located near it.

Public Meeting: 6:00 pm to 8:00 pm

Pike Middle School cafeteria,

2200 Texan Drive,

Justin, Texas 76247

Public Meeting Notice

Public Meeting Location Map

Project Schematics