Proposed Improvements to US 380 from Denton County Line to Hunt County Line - Public Meeting

Thursday, April 26, 2018

CSJs: 0135-11-022, 0135-02-059, 0135-03-048, 0135-04-032, 0135-05-026

The Texas Department of Transportation (TxDOT) is conducting a feasibility study for improvements to
US 380 through Collin County, a distance of approximately 32 miles. TxDOT will conduct three public
meetings to discuss and receive public comments on the proposed project. All three meetings will
present the same information and will be held in an open house format with a formal
presentation. Representatives from TxDOT and project consultants will be available to answer questions
about the proposed project improvements.

The purpose of the study is to analyze potential roadway options for US 380, including improving the
existing alignment or utilizing new alignments. Alignment options could require additional right-of-way to
accommodate the project.

Study data and maps showing roadway alignments options will be available for viewing at the public
meetings. This information will also be available for public inspection Monday through Friday between the
hours of 8:00 a.m. and 5:00 p.m. at the TxDOT Dallas District. Meeting information will also be available
online at www.Drive380.com.

Open house: 6:00 p.m.

Formal presentation: 7:00 p.m.

Sheraton McKinney

1900 Gateway Boulevard,

McKinney, TX 75070

Public Meeting Notice (English)

Public Meeting Notice (Spanish)

Public Meeting Venue Map

US 380 Project Page