IH 30 From the IH 35E interchange To the IH 45/IH 345 Interchange - Public Meeting

Tuesday, October 29, 2019

CSJ: 0009-11-181

Purpose:

To present the project studies completed to date and identify relevant issues related to the proposed improvements to IH 30 project from the IH 35E Interchange to the IH 45/IH 345 interchange, in Dallas County, Texas as part of the National Environmental Policy Act (NEPA) process.  The purpose of this public meeting is to present the proposed project and to receive public comments.

Description

The proposed project would consist of the reconstruction and widening of IH 30 from the IH 35E interchange to the IH 45/IH 345 interchange within the City of Dallas in Dallas County, Texas. Proposed improvements consist of the reconstruction of IH 30 from an existing urban freeway with three mainlanes in each direction, one to three collector/distributor lanes in each direction and no frontage roads, to a proposed urban freeway with six mainlanes in each direction with discontinuous frontage roads. The proposed mainlanes would consist of 10-foot-wide inside and outside shoulders, six 12-foot-wide travel lanes in each direction, and ramping improvements. The proposed improvements would require additional ROW.

Special Accommodations

TxDOT makes every reasonable effort to accommodate the needs of the public. The open house and hearing will be conducted in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call the TxDOT Dallas District Public Information Office at (214) 320-4480 at least two working days prior to the meeting. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.

MOU NEPA Assignment

The environmental review, consultation and other actions required by applicable federal environmental laws for this project are being, or have been carried-out by TxDOT pursuant to 23 U.S.C 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration and TxDOT.

Where:

The Omni Dallas Hotel

The Dallas Ballroom

555 S. Lamar Street

Dallas, Texas 75202

When:

Tuesday, October 29, 2019
Open House Format from 5:30 p.m. to 8:00 p.m.

With Formal Presentation at 7:00 p.m.

Public Meeting Notice (English)

Public Meeting Notice (Spanish)

Public Meeting Venue Map

October 29, 2019 IH 30 (Canyon) PROJECT PUBLIC MEETING MATERIALS

0009-11-181_I-30 Canyon PM PowerPoint Presentation_10-29-19
0009-11-181-I-30_Preliminary Conceptual Design Exhibit
City of Dallas Downtown Planned Projects Illustrative
City of Dallas History Board
City of Dallas I-30 Illustrative
City of Dallas Landscaping Board
City of Dallas Precedent Images Board
City of Dallas Street Grid Board
City of Dallas Street Section Board
PM 2019.10.29 Previous Concepts