Virtual Public Meeting for Loop 9, Segment A

From US 67 to IH 35E
Dallas and Ellis Counties, Texas
CSJ 2964-10-006

March 2, 2022

This virtual meeting begins on Wednesday March 2, 2022, at 5:30 PM and will remain available online through the comment period deadline of March 18, 2022. During this time, please view the project materials and other information provided on this site to learn about the project and provide your comments.

PROJECT DESCRIPTION

The Loop 9, Segment A project includes the construction of a six-lane new location frontage road system between US 67 and IH 35E through Dallas and Ellis counties, Texas, and is approximately 9.4 miles in length. The new location frontage road system would include an eastbound and westbound frontage road facility, each consisting of three 12-foot lanes, an 8-foot inside shoulder, and an 8-foot outside shoulder for bicycle accommodations within the rural section of the proposed roadway. The proposed project right of way would include a median wide enough to accommodate the future construction of an ultimate access-controlled mainlane facility.

PRESENTATION

Presentation (English)
Presentation (Spanish)
Script (English)
Script (Spanish)

TxDOT EXHIBITS

You may click on any of the project exhibits below to view them at full size

SCHEMATICS

Alternative 1 
Alternative 2 
Alternative 3
Alternative 4
Modifications A, C and D
Modification B

HANDOUTS

Project Information Sheet

INTERACTIVE MAP

Click Here to View the Loop 9 Interactive Map!

This map enables you to comment on specific locations along the Loop 9, Segment A corridor.

Instructional video for Interactive Map
 

RIGHT OF WAY (ROW) INFORMATION

The proposed improvements would require additional ROW. The proposed project ROW would include a median (358 to 512 feet wide) that would accommodate the future construction of an ultimate access-controlled mainlane facility.

Information about the process for state purchase of ROW and relocation assistance may be found in the following pamphlets: 

Relocation Assistance:  English
Relocation Assistance:  Spanish
State Purchase of ROW:  English
State Purchase of ROW:  Spanish

HOW TO PROVIDE COMMENTS

The deadline for providing comments is Friday, March 18, 2022.

CLICK HERE TO COMMENT NOW 
COMENTARIO EN ESPANOL

QUESTIONS?

Contact the TxDOT project manager Liang Ding, P.E. to ask questions about the project at [email protected] or (214) 320-6625.